How to see tpo toefl results4/8/2024 For example, when I decided to work in one project everything that does not belong to that particular work is moved to other place so I can focus much better in what I am doing and study. Moreover, the agenda and the workplace dedicated to the project would be more effective. Secondly, I also believe the organization would improve considerable when working in only one project other than several at the same time. Finally, after a lot of work and night without sleep I could finish the project successfully. At that time, internet was not an option for research as today and I had to look for information into specialised libraries and the only way to success was cancelling all the other projects and activities I was involved in. When I was a student in grade 12, I had to prepare a project about history in a very slim frame time. To illustrate this point, my personal experience is a proof of it. In other words, a better quality result could come out with a team dedicated only into one big topic to develop. I feel this way because of two main reasons, which I will explore in the following essay.įirst of all, I consider that having only one project to work with allow a deeper research and focuses to the topic by the researchers. I believe that complete a project before starting the next is the best way to work. As far as I am concerned, I belong to the first group. Without a doubt, many people would believe that focus in only one proyect per time would be better when others may consider the opposite point of view.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |